Workshop Strengthening - Fairline Boats

This project involved the removing of the existing yellow gantry steelwork and the installation of members to form a truss from the existing portal frame. This was to enable new cranes to be installed for moving the luxury yachts the firm produces. The existing portal frames were drilled for connections with the new blue steel, which was then bolted into position. This was necessary to avoid hot works on the site, which was still being used to house yachts in production. The contract also included the supply of roof steels and purlins for an extension to the building.